HFO Engine

Co-Generation Project

M/S. CRESCENT CHEMICAL & ACRYRLIC PLANT, WINDER:

  • x 5 MW Gas turbines had been proposed & L.C. was established in 1999 but unfortunately could not be commissioned till yet.

M/S. EASTERN EXPORT LTD, KORANGI KARACHI: (CO-GENERATION)

  • 1 x 700 kW Gas Engines heat recovery boiler has been proposed & is in operation since February 2004.
    Reference : Mr. Abdul Razzak / Mr. Shabbir Teli Directors Telephone No. : 5063908, 5068641

UTAH GROUP LTD, BANGLADESH:

  • A leading Garment Group of Bangladesh established & commissioned 1 x 5MW Gas turbine (co-gen plant) with waste heat recovery boiler to cater for the total power & steam requirement of 10 tons for their dyeing & Spinning unit in 2001 at Ghazipur Dakkah.
    Reference : Muhammad Bhai –Director Telephone No. : +880 2 8611151

MOVEN PICK ( FORMERLY KARACHI SHERATON HOTEL & TOWER ) :

  • A leading five star hotel under the management of Arabian Sea Enterprises Ltd established co-generation of 3 MW of 3-Cat -35516-B to cater for the demand of 3 MW, as well as supplement the steam & hot water requirement through waste heat recovery boiler of 2 TPH for supplementing to hotel system as well as hot water utilization for main kitchen etc & in operation since Dec-2006.

JAPAN POWER LTD RAIWIND LAHORE (IPP PROJECT):

  • 20 X 5MW (100 MW) HFO Gas Engines have been executed & in operation since 2002.

VASTI POWER PAKISTAN (PVT) LTD.(BIN QASIM):

  • 386 MW GT+ST Combine Cycle Power Plant at Bin Qasim, currently in pre- feasibility stage,(IPP Project for KESC.

VASTI POWER PAKISTAN (PVT) LTD.(BIN QASIM):

  • 386 MW GT+ST Combine Cycle Power Plant at Bin Qasim, currently in pre- feasibility stage,(IPP Project for KESC.