HFO Engine
Co-Generation Project
M/S. CRESCENT CHEMICAL & ACRYRLIC PLANT, WINDER:
- x 5 MW Gas turbines had been proposed & L.C. was established in 1999 but unfortunately could not be commissioned till yet.
M/S. EASTERN EXPORT LTD, KORANGI KARACHI: (CO-GENERATION)
- 1 x 700 kW Gas Engines heat recovery boiler has been proposed & is in operation since February 2004.
Reference : Mr. Abdul Razzak / Mr. Shabbir Teli Directors Telephone No. : 5063908, 5068641
UTAH GROUP LTD, BANGLADESH:
- A leading Garment Group of Bangladesh established & commissioned 1 x 5MW Gas turbine (co-gen plant) with waste heat recovery boiler to cater for the total power & steam requirement of 10 tons for their dyeing & Spinning unit in 2001 at Ghazipur Dakkah.
Reference : Muhammad Bhai –Director Telephone No. : +880 2 8611151
MOVEN PICK ( FORMERLY KARACHI SHERATON HOTEL & TOWER ) :
- A leading five star hotel under the management of Arabian Sea Enterprises Ltd established co-generation of 3 MW of 3-Cat -35516-B to cater for the demand of 3 MW, as well as supplement the steam & hot water requirement through waste heat recovery boiler of 2 TPH for supplementing to hotel system as well as hot water utilization for main kitchen etc & in operation since Dec-2006.
JAPAN POWER LTD RAIWIND LAHORE (IPP PROJECT):
- 20 X 5MW (100 MW) HFO Gas Engines have been executed & in operation since 2002.
VASTI POWER PAKISTAN (PVT) LTD.(BIN QASIM):
- 386 MW GT+ST Combine Cycle Power Plant at Bin Qasim, currently in pre- feasibility stage,(IPP Project for KESC.
VASTI POWER PAKISTAN (PVT) LTD.(BIN QASIM):
- 386 MW GT+ST Combine Cycle Power Plant at Bin Qasim, currently in pre- feasibility stage,(IPP Project for KESC.